- Home > Products > Calcining Equipment > Lime Kiln >
Capacity: 50 - 500 (t/d)
Fuel: Mixed Fuel, Gas, Coal Powder
Limestone Size: 30~60 (mm) / 40~80 (mm)
Application: Lime production plant
Capacity | 50 (t/d) | 100 (t/d) | 150 (t/d) | 200 (t/d) | 300 (t/d) | 400 (t/d) |
---|---|---|---|---|---|---|
Main Equipment | Main supporting equipment models and technical & economic indicators | |||||
Distributor | BL-1 | BL-2 | BL-2 | BL-3 | BL-3 | BL-4V |
Vertical Kiln | 60m³ | 150m³ | 200m³ | 250m³ | 400m³ | 500m³ |
Kiln Chamber Section Form | Round | |||||
Lime Discharging Device | WF-1 | WF-2 | WF-2 | WF-3 | WF-4 | WF-5 |
Calcination Temp. /℃ | 1100±50 | |||||
Energy Consumption Index /(kCal/kg Lime) | 950±50 | |||||
Power Consumption Index /(kW·h/t Lime) | 25±5 | |||||
Limestone: Lime | 1.6~1.75:1 | |||||
Light & Over Burnt Rate /% | ≤13 | |||||
Lime Activity /ml | 220~280(depends on the composition of limestone) | |||||
Lime Discharging Temperature /℃ | Ambient Temperature+60 | |||||
Limestone Feeding Size /mm | 30~80/80~120 | |||||
Emission concentration /(mg/Nm3) | ≤30 | |||||
Working Days / Days Per Year | ≥340 | |||||
Overhaul Cycle/Year | 3~5 | |||||
Labor/Shift | 2 | |||||
Applicable Fuels | Lump Anthracite, Lump Coke, Lump Petroleum Coke, Lump Biomass Fuel, etc. |
1. Simplicity of construction and operation, low initial cost.
2. High thermal efficiency & high volumetric efficiency.
3. Minimum decrepitation of solid products and minumum erosion of refrectory linings due to slight movement of particles relative to each other.
4. Less cover area, because the vertical kiln in vertical layout, feeding use the single bucket elevator in high angle layout, each functional area is decorated compact, greatly reduces the cover area.
5. The shell of kiln use four layer refractory in vertical masonry, good effect of thermal insulation, the temperature of shell will be controlled higher 60℃ than environment, save energy remarkably.